Advertisement

US Bank Stadium Still Working to Repair Panels

US Bank Stadium Still Working to Repair Panels Photo: Pipdipchip / Wikipedia / CC BY-SA 4.0.

August 24, 2017 08:48 AM

MINNEAPOLIS (AP) - Crews are continuing to repair exterior panels on U.S. Bank Stadium as the Minnesota Vikings prepare for their second season in the facility.

The $1.1 billion stadium in downtown Minneapolis was completed more than a year ago, but workers are still fixing panels in about half a dozen spots.

Advertisement

The durability of the panels has long been a concern. Panels came loose during storms in July 2016 and last March. Earlier this year, water seeped through and created puddles in various places.

Finance & Commerce reports about 10 percent of zinc panels covering the outside of the stadium are being repaired. The work is expected to wrap up next month.

The Minnesota Sports Facilities Authority says the repairs are covered under warranty, and there is no cost to taxpayers.

(Copyright 2017 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)


KAAL-TV

(Copyright 2017 by The Associated Press. All Rights Reserved.)

Advertisement
Relay Media Amp
Advertisement

Most Read Stories

Candidate Endorsements Chosen

Candidate Endorsements Chosen


Trump Says He Doesn't Think Personal Lawyer will 'Flip'

Barbara Bush's Casket Wheeled Out of Church

Iowa State Patrol Says 3 Killed in Crash Near Charles City

Former Marshalltown Educator Faces Child Porn Charges

Man Killed After Suspect Fleeing Police Struck his Vehicle.

Advertisement
Advertisement
Advertisement