Advertisement

US Bank Stadium Still Working to Repair Panels

US Bank Stadium Still Working to Repair Panels Photo: Pipdipchip / Wikipedia / CC BY-SA 4.0.

August 24, 2017 08:48 AM

MINNEAPOLIS (AP) - Crews are continuing to repair exterior panels on U.S. Bank Stadium as the Minnesota Vikings prepare for their second season in the facility.

The $1.1 billion stadium in downtown Minneapolis was completed more than a year ago, but workers are still fixing panels in about half a dozen spots.

Advertisement

The durability of the panels has long been a concern. Panels came loose during storms in July 2016 and last March. Earlier this year, water seeped through and created puddles in various places.

Finance & Commerce reports about 10 percent of zinc panels covering the outside of the stadium are being repaired. The work is expected to wrap up next month.

The Minnesota Sports Facilities Authority says the repairs are covered under warranty, and there is no cost to taxpayers.

(Copyright 2017 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)


KAAL-TV

(Copyright 2017 by The Associated Press. All Rights Reserved.)

Advertisement
Relay Media Amp
Advertisement

Most Read Stories

Justin Timberlake invited back to Super Bowl halftime show

Justin Timberlake invited back to Super Bowl halftime show


U.S. Pushes Saudi Arabia & Iraq on United Front to Counter Iran

President Trump Plans to Help Pay Aides Legal Costs in Russia Probe

Train Derailment Sends Cars Into Buildings

Hunting Instructor Shortage Brings Larger Numbers to Rochester Safety Classes


Advertisement
Advertisement
Advertisement